A

Admin • 802.91K Points
Coach

Q. A tractor shovel has a purchase price of Rs. 4.7 lacs and could save the organization an amount of rupees one lac per year on operating costs. The salvage value after the amortization period is 10% of the purchase price. The capital recovery period will be

  • (A) 3.7 years
  • (B) 4.23 years
  • (C) 5 years
  • (D) 7.87 years

A

Admin • 802.91K Points
Coach

Q. The first method invented for planning projects, was

  • (A) Bar chart method
  • (B) Milestone chart
  • (C) Critical path method (CPM)
  • (D) Programme Evaluation and Review Technique (PERT)

A

Admin • 802.91K Points
Coach

Q. Which one of the following is not an excavating and moving type of equipment?

  • (A) Bulldozer
  • (B) Clam shell
  • (C) Scraper
  • (D) Dump truck

A

Admin • 802.91K Points
Coach

Q. The main disadvantage of line organisation, is

  • (A) Rigid structure
  • (B) Extraordinary delay in communications
  • (C) Top level executions over work
  • (D) All the above

A

Admin • 802.91K Points
Coach

Q. Batching refers to

  • (A) Controlling the total quantity at each batch
  • (B) Weighing accurately, the quantity of each material for a job beforemixing
  • (C) Controlling the quantity of each material into each batch
  • (D) Adjusting the water to be added in each batch according to the moisture content ofthe materials being mixed in the batch

A

Admin • 802.91K Points
Coach

Q. While scheduling a project by C.P.M.

  • (A) A project is divided into various activities
  • (B) Required time for each activity is established
  • (C) Net work is drawn by connecting the activities and the events
  • (D) All the above

A

Admin • 802.91K Points
Coach

Q. Slack time refers to

  • (A) An activity
  • (B) An event
  • (C) Both event and activity
  • (D) None of the above

A

Admin • 802.91K Points
Coach

Q. Final technical authority of a project lies with

  • (A) Assistant Engineer
  • (B) Executive Engineer
  • (C) Superintending Engineer
  • (D) Chief Engineer

A

Admin • 802.91K Points
Coach

Q. Whenever an activity has zero total float, then

  • (A) Free float of the activity must be zero but independent float need not be zero
  • (B) Independent float must be zero but free float need not be zero
  • (C) Free float and independent float both must be zero
  • (D) Free float and independent float both need not be zero