Q. Work study is concerned with

  • (A) improving present method and finding standard time
  • (B) motivation of workers
  • (C) improving production capability
  • (D) improving production planning and control

A

Admin • 799.53K Points
Coach

Q. A big advantage of PERT over Gantt charts is that in the former case

  • (A) activities and events are clearly shown
  • (B) early start and late finish of an ac¬tivity are clearly marked
  • (C) activity times are clear
  • (D) inter-relationship among activities is clearly shown.

A

Admin • 799.53K Points
Coach

Q. A graphical device used to determine the break-even point and profit potential under varying conditions of output and costs, is known as

  • (A) Gnatt chart
  • (B) flow chart
  • (C) break-even chart
  • (D) PERT chart

A

Admin • 799.53K Points
Coach

Q. A low unit cost can be obtained by following

  • (A) product layout
  • (B) functional layout
  • (C) automatic material handling equipment
  • (D) specialization of operation

A

Admin • 799.53K Points
Coach

Q. ABC analysis deals with

  • (A) analysis of process chart
  • (B) flow of material
  • (C) ordering schedule of job
  • (D) controlling inventory costs money

A

Admin • 799.53K Points
Coach

Q. Acceptance sampling is widely used in

  • (A) batch production
  • (B) job production
  • (C) mass production
  • (D) all of the above

A

Admin • 799.53K Points
Coach

Q. According to MAPI formula, the old machine should be replaced by new one when

  • (A) CAM < DAM
  • (B) CAM > DAM
  • (C) CAM = DAM
  • (D) there is no such criterion

A

Admin • 799.53K Points
Coach

Q. According to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be

  • (A) HA
  • (B) HA + (S~A) HA
  • (C) HA + ^ˆ-H
  • (D) HA + ^ˆ-H

A

Admin • 799.53K Points
Coach

Q. An optimum project schedule implies

  • (A) optimum utilisation of men, machines and materials
  • (B) lowest possible cost and shortest possible time for project
  • (C) timely execution of project
  • (D) to produce best results under given constraints

A

Admin • 799.53K Points
Coach

Q. Basic motion time study gives times for basic motions in ten thousandths of

  • (A) second
  • (B) minute
  • (C) hour
  • (D) day