Industrial Engineering MCQs with answers Page - 2

Here, you will find a collection of MCQ questions on Industrial Engineering. Go through these questions to enhance your preparation for upcoming examinations and interviews.

To check the correct answer, simply click the View Answer button provided for each question.

Have your own questions to contribute? Click the button below to share your MCQs with others!

+ Add Question

A

Admin • 802.91K Points
Coach

Q. Basic tool in work study is

  • (A) graph paper
  • (B) process chart
  • (C) planning chart
  • (D) stop watch

A

Admin • 802.91K Points
Coach

Q. Bin card is used in

  • (A) administrative wing
  • (B) workshop
  • (C) foundary shop
  • (D) stores

A

Admin • 802.91K Points
Coach

Q. Break-even analysis can be used for

  • (A) short run analysis
  • (B) long run analysis
  • (C) average of above two run analysis
  • (D) there is no such criterion

A

Admin • 802.91K Points
Coach

Q. Break-even analysis consists of

  • (A) fixed cost
  • (B) variable cost
  • (C) fixed and variable costs
  • (D) operation costs

A

Admin • 802.91K Points
Coach

Q. Break-even analysis shows profit when

  • (A) sales revenue > total cost
  • (B) sales revenue = total cost
  • (C) sales revenue < total cost
  • (D) variable cost < fixed cost

A

Admin • 802.91K Points
Coach

Q. Choose the wrong statement Time study is used to

  • (A) determine overhead expenses
  • (B) provide a basis for setting piece prices or incentive wages
  • (C) determine standard costs
  • (D) determine the capability of an operator to handle the number of machines

A

Admin • 802.91K Points
Coach

Q. Choose the wrong statement. Motion study is used for

  • (A) improving a work method
  • (B) improvising a work method
  • (C) designing a work method
  • (D) reducing inventory costs

A

Admin • 802.91K Points
Coach

Q. CPM has following time estimate

  • (A) one time estimate
  • (B) two time estimate
  • (C) three time estimate
  • (D) four time estimate

A

Admin • 802.91K Points
Coach

Q. CPM is the

  • (A) time oriented technique
  • (B) event oriented technique
  • (C) activity oriented technique
  • (D) target oriented technique

A

Admin • 802.91K Points
Coach

Q. Current assets include

  • (A) manufacturing plant
  • (B) manufacturing plant and equipment
  • (C) inventories
  • (D) common stock held by the firm

Add MCQ in this Category

If you want to share an MCQ question in this category, it's a great idea! It will be helpful for many other students using this website.

Share Your MCQ