Industrial Engineering MCQs with answers Page - 5

Here, you will find a collection of MCQ questions on Industrial Engineering. Go through these questions to enhance your preparation for upcoming examinations and interviews.

To check the correct answer, simply click the View Answer button provided for each question.

Have your own questions to contribute? Click the button below to share your MCQs with others!

+ Add Question

A

Admin • 831.35K Points
Coach

Q. A process layout is generally suggested for

  • (A) Jobbing work
  • (B) Batch production
  • (C) Planned production
  • (D) Discontinuous production

A

Admin • 831.35K Points
Coach

Q. The remuneration factor which usually hs the greatest effect on the final pay structure is

  • (A) Prevailing pay expensation criteria
  • (B) Payment method
  • (C) Union bargaining power
  • (D) Incentives

A

Admin • 831.35K Points
Coach

Q. Systematic apratisal of each job in the organisation to determine its comparative value, is known as

  • (A) Job evaluation
  • (B) Job specification
  • (C) Incentive plan
  • (D) Standardisation

A

Admin • 831.35K Points
Coach

Q. If D = duration, EF = earliest finish time, ES = earliest start time, LF = latest finish time, LS = latest start time, which relationship does not hold?

  • (A) EF = D - ES
  • (B) EF = D + ES
  • (C) LF = LS + D
  • (D) None of the above

A

Admin • 831.35K Points
Coach

Q. Average fixed cost

  • (A) falls as long as output rises
  • (B) rises as long as output rises
  • (C) is determined by adding average variable cost and average total cost
  • (D) is cut by marginal cost at its lowest point

A

Admin • 831.35K Points
Coach

Q. Injunction is

  • (A) Permanent closure of a establishment
  • (B) Lock out of an establishment
  • (C) A court decision
  • (D) A memorandum

A

Admin • 831.35K Points
Coach

Q. A product layout is generally suggested for

  • (A) Jobbing work
  • (B) Batch production
  • (C) Efficien, machine utilization criteria
  • (D) Continuous production

A

Admin • 831.35K Points
Coach

Q. Monte Carlo simulation of queues is used when

  • (A) arrival time distributions are not standard
  • (B) service time distributions are not standard
  • (C) mathematical analysis cannot be adopted
  • (D) All of the above

A

Admin • 831.35K Points
Coach

Q. Multi-storey buildings are used for

  • (A) chemical plants
  • (B) total mills
  • (C) engineering industries
  • (D) All of the above

A

Admin • 831.35K Points
Coach

Q. In which operation the horse power required to remove one cubic centimetre of material (soft steel) per minute under average conditions will be maximum

  • (A) Drilling
  • (B) Turning
  • (C) Grinding
  • (D) Shaping

Add MCQ in this Category

If you want to share an MCQ question in this category, it's a great idea! It will be helpful for many other students using this website.

Share Your MCQ