Q. Each work should be planned with respect to ?

  • (A) manner of execution of the work
  • (B) urgency of the work
  • (C) availability of resources
  • (D) all of these

A

Admin • 802.91K Points
Coach

Q. The final technical authority of a project is ?

  • (A) Assistant Engineer
  • (B) Executive Engineer
  • (C) Superintending Engineer
  • (D) Chief Engineer

A

Admin • 802.91K Points
Coach

Q. F.W. Taylor introduced a system of organisation known as ?

  • (A) line organisation
  • (B) functional organisation
  • (C) line and staff organisation
  • (D) none of these

A

Admin • 802.91K Points
Coach

Q. CPM stands for ?

  • (A) Combined Process Method
  • (B) Critical Path Method
  • (C) Common Planning Method
  • (D) Critical Process Method

A

Admin • 802.91K Points
Coach

Q. In construction work, the controlling function aims at ?

  • (A) keeping a watch over the physical progress of each activity of the work
  • (B) controlling the expenditure on each item of work
  • (C) controlling the use of machines and materials
  • (D) all of the above

A

Admin • 802.91K Points
Coach

Q. The occurrence of the starting of an activity, is called its ?

  • (A) head event
  • (B) tail event
  • (C) dual role event
  • (D) none of these

A

Admin • 802.91K Points
Coach

Q. The jobs going ahead of schedule are conveniently shown in ?

  • (A) Gantt chart
  • (B) milestone chart
  • (C) pie chart
  • (D) none of these

A

Admin • 802.91K Points
Coach

Q. In CPM, the cost slope is determined by ?

  • (A) Crash cost / Normal cost
  • (B) (Crash cost - Normal cost) / (Normal time - Crash time)
  • (C) Normal cost / Crash cost
  • (D) (Normal time - Crash time) / (Crash cost - Normal cost)

A

Admin • 802.91K Points
Coach

Q. In a line organisation ?

  • (A) discipline is strong
  • (B) quick decisions are taken
  • (C) responsibility of each individual is fixed
  • (D) all of these

A

Admin • 802.91K Points
Coach

Q. The field of activities of an engineer includes ?

  • (A) estimation
  • (B) approval of construction plans by the local authority
  • (C) inspection and payment of work done by contractor
  • (D) all of the above