Q. The salient feature of the organisation evolved by F.W. Taylor is ?

  • (A) strict adherence to specification
  • (B) separation of planning and design part for field work
  • (C) each individual maintains functional efficiency
  • (D) all of the above

A

Admin • 802.91K Points
Coach

Q. The bar chart is also ?

  • (A) flow chart
  • (B) time chart
  • (C) travel chart
  • (D) Gantt chart

A

Admin • 802.91K Points
Coach

Q. Dummy activities are used to ?

  • (A) determine the critical path
  • (B) determine the project completion time
  • (C) maintain the required net work
  • (D) none of these

A

Admin • 802.91K Points
Coach

Q. The amount of time by which the activity completion can te start of succeeding activity, is known as ?

  • (A) earliest completion time
  • (B) total float
  • (C) free float
  • (D) none of these

A

Admin • 802.91K Points
Coach

Q. Travel charts are used to ?

  • (A) analyse material handling
  • (B) determine inventory control difficulties
  • (C) plan material handling procedure and routes
  • (D) all of the above

A

Admin • 802.91K Points
Coach

Q. The estimated time required to complete an activity is known as ?

  • (A) duration
  • (B) float
  • (C) restraint
  • (D) all of these

A

Admin • 802.91K Points
Coach

Q. The major principle of an organisation is ?

  • (A) span of management
  • (B) unity of command
  • (C) delegation of authority
  • (D) all of these

A

Admin • 802.91K Points
Coach

Q. Technical planning is carried out for the ?

  • (A) preparation of detailed drawings
  • (B) preparation of detailed estimate
  • (C) planning resources and initiating procurement action
  • (D) all of the above

A

Admin • 802.91K Points
Coach

Q. Functional organisation system of working was introduced by ?

  • (A) Henry Gantt
  • (B) F.W. Taylor
  • (C) M.R. Walker
  • (D) none of these

A

Admin • 802.91K Points
Coach

Q. A critical activity has ?

  • (A) maxitnum float
  • (B) minimum float
  • (C) zero float