Q. Which of the following is/are advantages of item rate contract

  • (A) Elasticity and fair to both the parties
  • (B) Economical
  • (C) Absence of uncertainties
  • (D) All of the above

A

Admin • 802.91K Points
Coach

Q. Departmental execution is suitable for small jobs

  • (A) Right
  • (B) Wrong
  • (C) none
  • (D) all

A

Admin • 802.91K Points
Coach

Q. Which of the following is not essential requirement for contract

  • (A) Parties must be competent
  • (B) Should be made by free consent
  • (C) There shall be definite and legal proposal and its acceptance.
  • (D) Both Parties must be citizens of same country

A

Admin • 802.91K Points
Coach

Q. PERT requires

  • (A) Single time estimate
  • (B) Probable time estimate
  • (C) Triple time estimate
  • (D) None of the above

A

Admin • 802.91K Points
Coach

Q. CPM requires

  • (A) Single time estimate
  • (B) Probable time estimate
  • (C) Triple time estimate
  • (D) None of the above

A

Admin • 802.91K Points
Coach

Q. CPM stands for

  • (A) Combined process method
  • (B) Critical path method
  • (C) Construction planning method
  • (D) Continuous progress method

A

Admin • 802.91K Points
Coach

Q. An activity is represented by

  • (A) An arrow
  • (B) Circle
  • (C) Triangle
  • (D) None of the above