Concrete Technology MCQs with answers Page - 42

Here, you will find a collection of MCQ questions on Concrete Technology. Go through these questions to enhance your preparation for upcoming examinations and interviews.

To check the correct answer, simply click the View Answer button provided for each question.

Have your own questions to contribute? Click the button below to share your MCQs with others!

+ Add Question

A

Admin • 833.24K Points
Coach

Q. The process of proper and accurate measurement of all concrete materials for uniformity of proportions and aggregate grading is called ?

  • (A) proportioning
  • (B) grading
  • (C) mixing
  • (D) batching

A

Admin • 833.24K Points
Coach

Q. The construction joints in cement concrete ?

  • (A) should be located where bending moment is large
  • (B) should be located where shear force is large
  • (C) should not be provided at the corners
  • (D) should be spaced at a distance of 3 m apart in case of huge structures

A

Admin • 833.24K Points
Coach

Q. The final operation of finishing the concrete surface is called ?

  • (A) screeding
  • (B) floating
  • (C) trowelling
  • (D) none of these

A

Admin • 833.24K Points
Coach

Q. After the curing of 28 days, the concrete gains strength upto ?

  • (A) 40%
  • (B) 67%
  • (C) 100%
  • (D) 122%

A

Admin • 833.24K Points
Coach

Q. For concreting of tunnel lining, the concrete is transported by ?

  • (A) pumps
  • (B) pans
  • (C) wheel barrows
  • (D) containers

A

Admin • 833.24K Points
Coach

Q. When the batching of material is done by weight ?

  • (A) the bucket in which the material is to be weighed should be cleaned thoroughly
  • (B) the weighing machine should be levelled before placing the material
  • (C) the chart should be prepared indicating the weight of each material used for different strengths of concrete
  • (D) all of the above

A

Admin • 833.24K Points
Coach

Q. If 50 kg of fine aggregates and 100 kg of coarse aggregates are mixed in a concrete whose water-cement ratio is 0.6, the weight of water required for harsh mix is ?

  • (A) 8 kg
  • (B) 10 kg
  • (C) 12 kg
  • (D) 14 kg

A

Admin • 833.24K Points
Coach

Q. To prevent the cement bags from any possible contact with moisture, the main point that should be kept in mind is that the ?

  • (A) space between the exterior walls and piles should be 30 cm
  • (B) cement bags should be placed closer together in the piles
  • (C) width and height of the pile should not exceed 3 m and 2.70 m respectively
  • (D) all of the above

A

Admin • 833.24K Points
Coach

Q. The workability of concrete can be improved by adding ?

  • (A) hydrated lime
  • (B) flyash
  • (C) calcium chloride
  • (D) all of these

A

Admin • 833.24K Points
Coach

Q. If the effective plan area of a warehouse is 54 m², and the maximum height of pile permitted is I then the number of cement bags to be stored is ?

  • (A) 2000
  • (B) 2200
  • (C) 2500
  • (D) 2700

Add MCQ in this Category

If you want to share an MCQ question in this category, it's a great idea! It will be helpful for many other students using this website.

Share Your MCQ