Q. the equipment having a bucket is?

  • (A) Shovel
  • (B) Clam shell
  • (C) Dragline
  • (D) Hoe

A

Admin • 833.24K Points
Coach

Q. the compaction of sand is done by ______.

  • (A) Rollers
  • (B) Animals
  • (C) Vibrator
  • (D) Jetting

A

Admin • 833.24K Points
Coach

Q. the term _____ is used to indicate the process of allocating a prepaid expense to accounting periods during which there are benefits realized from the depreciable equipment.

  • (A) Cost depreciation
  • (B) Investment charges
  • (C) Maintenance and repair
  • (D) Operating cost

A

Admin • 833.24K Points
Coach

Q. in ______ method, it is assumed that a property loses its value by the same amount every year.

  • (A) Sinking fund
  • (B) Operating cost
  • (C) Constant percentage
  • (D) Straight line method

A

Admin • 833.24K Points
Coach

Q. in ______ method, the depreciation of properties assumed to be equal to the annual sinking fund plus the interest on the fund for that year.

  • (A) Sinking fund
  • (B) Annual fund
  • (C) Constant percentage
  • (D) Straight line

A

Admin • 833.24K Points
Coach

Q. in _______, the owner has to invest a certain amount for the purchase of an equipment.

  • (A) Cost depreciation
  • (B) Investment charges
  • (C) Operation cost
  • (D) Management

A

Admin • 833.24K Points
Coach

Q. the term _____ is used to indicate the period during which the equipment is not in ideal condition.

  • (A) Depreciation
  • (B) Downtime
  • (C) Inadequacy
  • (D) Normal deterioration

A

Admin • 833.24K Points
Coach

Q. if a hammer is raised by stem and allowed to fall by gravity on top of the pile, it is called as ______.

  • (A) Diesel hammer
  • (B) Vibratory hammer
  • (C) Single acting hammer
  • (D) Drop hammer

A

Admin • 833.24K Points
Coach

Q. in _____ type of cofferdam consists of a mixture of sand and clay which is filled in a bag and placed instead of earth or rock to form a cofferdam.

  • (A) Cellular cofferdam
  • (B) Earth dikes
  • (C) Rock dikes
  • (D) Sand bag dikes

A

Admin • 833.24K Points
Coach

Q. ______ process consists of making a number of holes in the ground and then filling these holes by the cement grout under pressure.

  • (A) Chemical grouting
  • (B) Cement grouting
  • (C) Freezing process
  • (D) Electro osmosis process