A

Admin • 596.21K Points
Coach

Q. In concrete walls, construction joints should be provided at the ?

  • (A) floor level
  • (B) soffit level of lintels
  • (C) sill level of windows
  • (D) all of these

No solution found for this question.
Add Solution and get +2 points.

You must be Logged in to update hint/solution

Discusssion

Login to discuss.

Be the first to start discuss.