Q. Semi-variable cost is also called:

  • (A) Mixed cost
  • (B) Fixed cost
  • (C) Step cost
  • (D) Sunk cost

Explanation by: Admin
Semi-variable costs include both fixed and variable components; hence called mixed costs.