Q. If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the activity, is

  • (A) (a + m + b)/6
  • (B) (a + 2m + b)/6
  • (C) (a + 4m + b)/6
  • (D) (a + 5m + b)/6

No solution found for this question.